Temporary Site Fence

Overturning & sliding assessment against wind

Inputs

Wind

≈ Gentle breeze

Fence panel

Affects the wind force coefficient Cf

Signs on mesh

No signs tied to this panel. Solid signs would block wind and add load — switch to “Add signs” to include them.

Self-weight, one panel

× 1 foot per panel (shared at joints)

Counterweights per foot (1 foot per panel, shared at joints)

Bracing

No bracing. The panel resists wind on its own feet and ballast alone.

Where the panel post sits on the foot

windfootpivot (leeward edge)lever 0.68 mpanel posts (2 per foot)0.75 m (wind dir.)0.22 m

Edge: post in the front holes (lever = foot length minus front offset).

Ground & base

Friction coefficient μ = 0.5

Sets a typical weight per foot

Stabilising lever arm (wind direction)

Plan dimension along the fence

Typ. 1.2 – 1.5

UK average wind speeds

Showing Annual (year-round avg) mean speeds. Click a bar to use that town's speed for the selected season.

Find by UK postcode

Worst case (winter) for Inverness: 7.2 m/s — use this if the fencing stays erected across several seasons.

0 m/s2 m/s4 m/s6 m/s8 m/sInvernessAberdeenPlymouthNewcastleCardiffGlasgowBelfastEdinburghBristolLiverpoolManchesterNorwichIpswichLincolnLondonBrightonCanterburyBirminghamKendalMorecambe

Annual mean wind speeds (typical UK values), scaled by season. For stability checks, consider applying a safety margin above the seasonal average.

Save assessment

Buy lifetime access to save assessments.

Assessment

windWbase 0.75m2m

Overturning

2.38× FoS

Stable

Stabilising vs overturning: 88 N·m

Target ≥ 1.50

Sliding

2.29× FoS

Stable

Friction vs wind: 83 N·m

Target ≥ 1.50

Wind speed

4.8m/s

Wind pressure

14Pa

Face area

7.00m²

Wind force

64N

Total weight

294N

30.0 kg · feet 16.0

Friction resistance

147N

Required added ballast to reach target FoS

0.0 kg / foot

Current configuration meets the target factor of safety.

Recent assessments

(0)

No saved assessments yet. Run a calculation and save it to start tracking your projects.

Indicative engineering check for temporary fencing. Wind force uses F = ½·ρ·v²·Cf·A with Cf reflecting panel porosity. Overturning is taken about the leeward foot edge; sliding uses ground friction μ·W. Confirm on-site with a qualified engineer before deployment.

© 2026 Soros Limited. All rights reserved.